Go to the directory in which you have installed the HEC-RAS example data sets. To review the data files for this example, from the main HEC-RAS window, select File and then Open Project. Specifically, this example will illustrate the use of multiple plans by analyzing the existing geometric conditions of the river reach and then analyzing a proposed change to the geometry. The modeler is referred to Chapter 5 of the User's Manual for a further discussion on working with projects and a discussion of the files that comprise a plan. Initially, this example will briefly discuss the elements of a project and the elements of a plan. Therefore, each plan can represent a development stage or analysis phase of the project. Each plan associates specific files of the project to be grouped together. A project is divided into one or more plans. Each river hydraulics application constitutes a project, which is a collection of files that are associated with the application. This example will demonstrate the use of working with multiple plans.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |